Auchroisk Distillery

Project: Auchroisk Distillery Balance TankĀ 
Location: Auchroisk, Banffshire
Client: Diageo

The project at Auchroisk Distillery involved comprehensive refurbishment and infrastructure improvements to a 65,000-litre distillery balance tank and its surrounding area. Key elements of the works included:

  • Draining and Cleaning of Balance Tank - Safe and controlled removal of all liquid contents followed by thorough internal cleaning to prepare the tank for inspection and repair.
  • Concrete Repairs - Structural repairs to the internal and external tank walls, addressing areas of deterioration to restore integrity and prolong service life.
  • Removal of Redundant Services - Decommissioning and removal of obsolete pipework and electrical cabling both inside and outside the tank to streamline the system and improve safety.
  • Construction of Service Housing - Formation of a new wind- and water-tight service housing to protect critical infrastructure and provide secure access for maintenance personnel.
  • Access Pathway Installation - Creation of a safe and durable pedestrian access path encircling the tank to facilitate routine inspections and maintenance.
  • Vehicle Access Improvements - Development of a robust vehicle access route around the tank to support operational logistics and emergency access.
  • Security Fencing - Installation of a perimeter security fence complete with lockable vehicle and pedestrian gates to enhance site safety and control access.
  • Land Grading and Turning Area - Regrading of the surrounding land to form a functional vehicle turning area, improving manoeuvrability and site efficiency.
2be35f9b 80ad 476e b2a6 3dc003684279
IMG 1327
Fe78c1c6 ba56 49be bf19 19985d52b113
2458cf55 9f02 4ccf 9569 ca2cc3fbff16
5a6ac530 8e9c 4f89 a57c d284c2cb0be4
IMG 1037
IMG 1036
IMG 9628 1
IMG 9626 2
IMG 9621 3

Explore Further Case Studies

Return to our main case study page