Energy & Renewables
Noss Head Switching Station
GI are currently subcontracted to BAM Nuttall Ltd for the Full construction of the Noss Head Switching Station for SSE Transmission, this is part of the Shetland HVDC Link.
Noss Head Switching Station takes major step forwards - SSEN Transmission (ssen-transmission.co.uk)
Strategic Spares Warehouse (Inverness)
Strategic Spares Warehouse (Dundee)
Tummel Bridge Power Station
Stronelairg Culvert Replacement
Alyth Substation
Noss Head Switching Station
Farigaig Sub Station
Stronelairg Wind Farm
St Fergus Substation
Bruar Hydro Scheme
Rothienorman Control Building
Lochaber Smelter Power house
Vaich Dam